Schedule Progress
Overview Pre-Con Site Foundation Structure Envelope MEP Finishes Closeout

Choose a project

Every tool works inside a project, so uploads, reports, and permissions stay organized per job.

No projects yet.

New project

Ask your company admin to create a project and add you to it.

Construction Management, Assisted

Plan, update, and defend your project schedule.

ai.CMpanion is a toolkit for construction managers, schedulers, and owners' reps. Build a baseline CPM schedule from a guided interview, convert Primavera P6 files into readable Excel, status updates, pinpoint delays, compare schedule revisions, and trace how the critical path has shifted over the life of the job — without living inside P6.

Primavera P6 XER / XML Excel CPM & float analysis DCMA 14-point

Choose a tool

πŸ“

Owner Schedule Review

Upload the contractor's baseline schedule (P6 XER). You'll get a Word Schedule Review Narrative Report: schedule summary, WBS and work package interfaces, logic and relationship checks benchmarked against DCMA, GAO and AACE, calendars and settings, and a list of required corrections.

Schedule 1

Schedule 2

Whichever one has the earlier data date becomes Schedule #1 in the report, regardless of which side you put it on.

Takes about 3–4 minutes.
Starting…

When Word asks to update fields, click Yes to build the table of contents and page numbers.

πŸ”—

Work Package Interfaces

Upload a P6 schedule (XER) to see every hand-off between work packages: an interactive 3D dome, the predecessor Γ— successor matrix, floor-by-floor hand-offs, the driving path across packages, a checklist of expected interfaces, ranked findings and a searchable tie register.

Reading file…
πŸ“Š

P6 β†’ Excel Converter

Upload a Primavera P6 XER file to get an Excel workbook with activities grouped by WBS and relationships grouped by type.

Reading file…

Sheet 1 β€” Activities

  • Grouped by WBS; bands colored by level, collapse / expand at every level
  • Durations & float in whole days, from each activity's calendar
  • Start milestones show start dates only; finish milestones show finish dates only
  • Start / Finish: Float Path 1 Longest Path both
  • Level of Effort actuals and % complete locked

Sheet 2 β€” Relationships

  • Grouped by type: FS, SS, FF, SF
  • Predecessor and successor ID, name, durations, % complete
  • Lag in days

Both sheets have sort & search on the header row.

πŸ”

Converter

Takes a few seconds per file.
Converting and checking…

Coming soon

What you'll provide

    What you'll get

      Select a Work Package

      Choose any phase to generate its schedule. You can do them in any order.

      Project Overview

      Answer the questions below to get started. Only questions relevant to your project are shown.

      Activity ID Activity Name WBS Days Start Finish Float Crit

      Gantt View β€”

      Critical Non-critical

      Full Baseline Schedule

      Editing durations, lag, or predecessors β€” click Save & Recalculate to recompute the schedule.

      ID Activity Name WBS Days Lag Predecessors Start Finish Float CP